智皓塑钢带铁粉碎机安装、试运行与验收需了解的知识

添加时间:2019-03-15 17:22:33   浏览次数: 次    【 】   打(da)印(yin)   关闭窗口(kou)

1、安(an)装

使用(yong)现场没(mei)有吊(diao)车(che)起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)设(she)备的情况下,应(ying)设(she)置(zhi)起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)梁,起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)梁应(ying)设(she)置(zhi)在带(dai)铁(tie)粉(fen)碎机纵轴线(xian)上方(fang),起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)梁的负荷应(ying)大于带(dai)铁(tie)粉(fen)碎机的重(zhong)(zhong)(zhong)(zhong)(zhong)量(liang)。当带(dai)铁(tie)粉(fen)碎机上方(fang)不(bu)便(bian)设(she)置(zhi)起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)梁时,应(ying)在轴承座(zuo)部位的设(she)备纵轴线(xian)上方(fang)设(she)置(zhi)起(qi)重(zhong)(zhong)(zhong)(zhong)(zhong)吊(diao)环。

带(dai)铁(tie)粉碎(sui)机的入料溜槽与机壳(qiao)采(cai)用螺(luo)栓(shuan)联(lian)接(jie),应(ying)尽(jin)量保证物料进入带(dai)铁(tie)粉碎(sui)机为(wei)沿齿辊轴向均匀分布(bu),为(wei)预防大块长(zhang)期砸损破碎(sui)齿,应(ying)尽(jin)量减小物料垂直落(luo)差。

带铁(tie)粉碎机在现场(chang)安装(zhuang)时,应首先将基础用水平仪(yi)找平,检测预埋螺(luo)栓尺(chi)(chi)寸与设备实际尺(chi)(chi)寸是否对应,然后起吊设备安装(zhuang)并紧固(gu);将控制(zhi)箱安装(zhuang)在预定位置。

2、试运转

2.1 准备工作
(1)按工作时齿辊的转向接通电机电源,齿辊工作转向无特殊要求一般为相向咬合;
(2)所有轴承加好润滑油;
(3)检查设备各零部件是否安装稳固。

2.2 试运转
(1)按启动和停止按钮,当各部分转动无异常后,即可投入空载运转。试运转时间不少于 4 小时,在此时间内通过视觉、听觉和触觉对设备进行检查,设备应启动平稳,运转可靠无特殊噪音。
(2)开车 4 小时后轴承温度不得超过 65℃,温升不得超过 30℃。

3、满载运(yun)行

4、小时(shi)空车运转(zhuan)后(hou)应(ying)对设(she)备(bei)的安(an)装工程进行(xing)验收,而后(hou)可以带料运行(xing)。并继续观察上述各项运转(zhuan)情况,一切正常后(hou)方可投入(ru)正常生产

 

 



微信联系咨询


手机浏览网站

地址:河北省定州市周村镇北辛兴村    手机:18612222212  电话:0312-2592222 / 2647777
传真:0312-2643118  QQ:  邮箱:zyttsy@sohu.com
Copyright © 河北智皓环保机械制造有限公司 All Rights Reserved     :  
姚记棋牌58艾尔棋牌官方网 document.writeln("");